H/HYDRA TOOLKIT
SUPPLY INTELLIGENCE

AI Factory Tracker

Signal window: 2026-09-23 to 2026-09-30

Data: static snapshot (Sep 30, 2026 scan)Loading
MARKET PULSEAs of Oct 2–4, 2026
B200 · Ornn OCPI$7.90/GPU-hr▲ +22.3% 30d · 3-mo range $5.14–8.14
H200 · Ornn OCPI$6.23/GPU-hrOct 2, 2026
H100 SXM · Ornn OCPI$2.79/GPU-hrOct 2, 2026
A100 SXM4 · Ornn OCPI$0.90/GPU-hrOlder GPUs still earn
H100 1-yr contracts+~40%$1.70 → $2.35/hr (Oct '25 → Mar '26, SemiAnalysis)
Hyperscaler 2026 capex~$720–745BCombined guidance (Q2 calls)
Neocloud cost of capital>20%Financing often unavailable, so asset-light wins

Sources: Ornn OCPI (data.ornn.com, Oct 2, 2026) · SemiAnalysis H100 1-yr index · Yield Theory hyperscaler capex tracker (Sept 30, 2026) · NVIDIA, PR Newswire. As of Oct 2026.

PRIORITY PIPELINE

Top 5 Opportunities

The most actionable supply prospects from the latest available scan

5 opportunities
#1—

200 MW (→500+ MW) Potter County TX campus with land locked and no tenant yet; Hydra can be the anchor GPU tenant/operator that makes it financeable.

Pre-tenant, pre-construction powered-land play: exactly where our asset-light AI Factory model (bring GPU demand + capital partners, operate/monetize via Brokkr) creates value. Pitch: our platform as anchor/phase-1 GPU tenant-operator for the first ~200 MW (or a first block), turning a land+power story into a financeable project.

Risks

no interconnection agreement yet (only 'potential path' via SPP 345 kV), on-site solar/battery+gas plan is unbuilt, small-cap developer financing risk, SPP queue timing.

MW
200 MW
Stage
Land secured (4,077-acre long-term ground lease w/ purchase option + water agreement, announced 2026-09-29). Construction planned to start after a tenant is secured; rent starts at construction.
Location
Potter County, TX (SPP; surrounds Xcel/SPS Potter County 345 kV substation)
Signal
—
Open source

Key people

Public sources, Apollo enrichment pending
  • Tyler HassenChief Executive Officer & Director
  • Alex SpiroChairman of the Board

Full contact details in CRM / Apollo

#2—

200-207 MW of contracted BTM power in Odessa TX for Q3 2027, no tenant yet: a tenant/capital partner is what they need most.

Behind-the-meter gas power adjacent to Vistra's 1,180 MW Odessa plant means no ERCOT interconnection queue for Phase 1, but the company still has no tenant and has posted/committed up to ~$198.8M in credit support. Pitch: our platform brings GPU demand + capital partners for a first Phase-1 block and Brokkr for operations, de-risking their tenant gap.

Risks

financing strain (ATM equity program opened Sept 24), Texas regulatory freeze on data-center permits reported late Sept, PPA conditions precedent due by 2027-12-31, speculative-developer profile.

MW
207 MW
Stage
Power contracted (PPA signed 2026-09-18, announced 2026-09-21); construction permits in hand per Aug 2026 10-Q release; no tenant announced; not yet under construction.
Location
Ector County (near Odessa), TX; 493-acre owned site, Permian Basin
Signal
—
Open source

Key people

Public sources, Apollo enrichment pending
  • Charlie NelsonChairman & Chief Executive Officer
  • Ted WarnerPresident & Chief Financial Officer
  • José RodriguezChief Operating Officer
  • E. Will Gray IIPresident, Permian Basin

Full contact details in CRM / Apollo

#3—

Just-permitted 27.5 MW first phase (1 GW ambition) in Weld County CO, Hydra's backyard; offer to fill and operate the first hall.

Front Range site ~1 hour from our Denver HQ, at the earliest stage (just-permitted, existing industrial buildings, first hall near-term). Pitch: our platform fills the first 27.5 MW hall with GPU supply/demand via its marketplace and runs it with Brokkr, with a local-partner story for expansion.

Risks

prior stop-work orders and community opposition, 1 GW ambition not backed by a stated utility power agreement, permit does not cover later phases, noise/water conditions.

MW
27.5 MW
Stage
Zoning: Use by Special Review permit USR26-0019 approved 5-0 on 2026-09-09; company COO said first data hall could be operational later in 2026. Conditions: closed-loop cooling, noise limits, decommissioning bond.
Location
Unincorporated Weld County near Windsor, CO
Signal
—
Open source

Key people

Public sources, Apollo enrichment pending
  • Sami IssaChief Executive Officer, Co-founder & Director
  • Michael CadiganChief Operating Officer

Full contact details in CRM / Apollo

#4—

563 MW energized Rockdale TX site plus 200 new acres for AI/HPC; miner needs GPU tenants and operating partners to convert.

Miner with a large energized interconnection plus new land for AI/HPC; its AI cloud so far is mostly in Malaysia/Norway, so the Texas conversion still needs GPU demand and operating know-how. Pitch: our platform as the GPU-tenant/marketplace partner for a first Rockdale AI block, with Brokkr to monetize capacity while Bitdeer keeps mining.

Risks

Bitdeer is building its own AI cloud (it could compete rather than partner), losses (Q2 operating loss $101.7M), ERCOT large-load rules and new power allocations, Singapore HQ decision-making.

MW
563 MW
Stage
Land: 200 acres bought fee-simple for ~$100M cash (completed Aug 2026, announced 2026-09-01) to develop AI/HPC; existing large-load interconnection; AI build at Rockdale not yet announced as tenanted.
Location
Milam County (Rockdale), TX, ~70 miles from Austin
Signal
—
Open source

Key people

Public sources, Apollo enrichment pending
  • Jihan WuChairman & Chief Executive Officer
  • Linghui KongChief Business Officer
    unverified
  • Michael PotterChief Financial Officer
  • Michael WhitselSite Manager, Rockdale
    unverified

Full contact details in CRM / Apollo

#5—

2.6 GW of new, conditionally studied ERCOT load (Caspian/Selene/Helios III) at an independent operator; pitch Hydra for a sub-hyperscale block.

The 2.6 GW of new, un-tenanted studied-load projects (Caspian, Selene, Helios III) are the earliest-stage and largest real-MW pipeline from an independent operator this month. Pitch: our platform as a GPU tenant/marketplace partner for a slice of the new sites, sized below a hyperscale lease, plus Brokkr for fleet ops.

Risks

Galaxy is well-capitalized and courts investment-grade hyperscale tenants (Helios is already anchored by a large tenant), studied-load allocation is uncertain, ERCOT audit outcome Dec 10.

MW
4.20 GW
Stage
Queue/interconnection: conditional Batch Zero classifications (Sept 2026), subject to ERCOT eligibility verification/audit with final report to PUCT due 2026-12-10.
Location
Texas (ERCOT)
Signal
—
Open source

Key people

Public sources, Apollo enrichment pending
  • Austin StormsCo-Head, Galaxy Data Centers
    unverified
  • Brian WrightCo-Head, Galaxy Data Centers
    unverified

Full contact details in CRM / Apollo

Every lead links to its public source. Facts come from source headlines/snippets; verify before outreach. Static snapshot of the Sep 30, 2026 scan. Market pulse figures as of Oct 2026.